-40%

ANTI SEABROOK NUCLEAR POWER PLANT Brochure C-10 New Hampshire AMESBURY Energy

$ 7.91

Availability: 56 in stock
  • Condition: Please see all photos and contact us with any questions. Thank you!
  • Item must be returned within: 30 Days
  • Refund will be given as: Money Back
  • Type: Brochure
  • Event: Seabrook
  • All returns accepted: Returns Accepted
  • Year: 1988
  • State: New Hampshire
  • Return shipping will be paid by: Seller
  • Restocking Fee: No

    Description

    ANTI SEABROOK BROCHURE
    FREE SHIPPING with delivery confirmation on all domestic purchases!
    8-panel brochure against the Seabrook Nuclear Power Plant in Seabrook, New Hampshire, "Citizens Within the Ten Mile Radius, C-10, Amesbury, Massachusetts"
    We ship worldwide! Please see all pictures and visit
    our eBay store and other eBay auctions!
    The Seabrook Nuclear Power Plant, more commonly known as Seabrook Station, is a nuclear power plant located in Seabrook, New Hampshire, United States, approximately 40 miles (64 km) north of Boston and 10 miles (16 km) south of Portsmouth. Two units (reactors) were planned, but the second unit was never completed due to construction delays, cost overruns and troubles obtaining financing. The construction permit for the plant was granted in 1976, and construction on Unit 1 was completed in 1986. Full power operation of Unit 1 began in 1990. Unit 2 has been canceled and most of its major components sold to other plants. With its 1,244-megawatt electrical output, Seabrook Unit 1 is the largest individual electrical generating unit on the New England power grid. It is the second largest nuclear plant in New England after the two-unit Millstone Nuclear Power Plant in Connecticut.
    The construction of Seabrook Station was completed ten years later than expected, with a cost approaching billion. The Nuclear Regulatory Commission (NRC) described its own regulatory oversight of Seabrook as "a paradigm of fragmented and uncoordinated government decision making," and "a system strangling itself and the economy in red tape."[2] The large debt involved led to the bankruptcy of Seabrook's major utility owner, Public Service Company of New Hampshire.[3] At the time, this was the fourth largest bankruptcy in United States corporate history.[4]
    A second reactor was proposed in 1972 and cancelled in 1988.[5] It was 22% complete.
    The plant was originally owned by more than 10 separate utility companies serving five New England states. In 2002, most sold their shares to FPL Energy (a subsidiary of FPL Group), later known as NextEra Energy Resources. NextEra Energy now owns 88.2% of Seabrook Station. The remaining portion is owned by municipal utilities in Massachusetts. The station is one of five nuclear generating facilities operated by FPL Group. The other four are St. Lucie Nuclear Power Plant and Turkey Point Nuclear Generating Station operated by sister company Florida Power & Light (a regulated utility), and the Duane Arnold Energy Center and Point Beach Nuclear Generating Station operated by NextEra Energy.
    In 2005, a security fence installed by a subcontracted engineering firm the previous year failed a Nuclear Regulatory Commission inspection and was declared inoperable.[6] In 2006, the owner of the plant, FPL Energy Seabrook LLC, was fined ,000 by the Nuclear Regulatory Commission since "both design of the system and testing procedures did not adhere to NRC guidelines".[7]
    During the 2008 presidential election, Republican nominee John McCain mentioned the possibility of building the once-planned second reactor at Seabrook. The idea drew cautious support from some officials, but would be difficult due to financial and regulatory reasons.[8]
    In 2017, due to the steady drop in value of nuclear power plants including Seabrook Station, the town of Seabrook enacted a 9.9 percent tax increase to offset the decrease in tax revenue collected from the plant's owner, NextEra Energy.[9]
    In February 2018, a magnitude 2.7 earthquake occurred approximately 10 miles from Seabrook Station, but the quake didn't trigger any emergency procedures or result in any signs of structural damage to the plant.[10]
    Relicensing
    Seabrook Station behind the Blackwater River seen from Route 1A in Seabrook, New Hampshire
    In 2010, the plant applied to have its operating license extended from 2030 to 2050.[11] In September 2012, Massachusetts Reps. Edward Markey and John F. Tierney filed HR 6554, titled the "Nuclear Reactor Safety First Act".[12] The bill would prevent nuclear plants from receiving 20-year license extensions from the Nuclear Regulatory Commission if they apply more than 10 years before their current 40-year licenses expire. The legislation was specifically aimed at Seabrook Station, which is currently experiencing aging-related problems 22 years into its operating license. The representatives have asserted that granting the plant a license extension covering operation from 2030 to 2050 based on inspections done in 2012 is illogical. They believe that inspection dates more than 10 years before the expiration of the current license are too far from the dates of validity for the extension and therefore may miss additional age-related problems that may occur in the future.
    In February 2012, there were safety concerns about concrete degradation at the plant. Concrete surrounding an electric control tunnel at the nuclear plant had lost almost 22 percent of its strength and was showing signs of an alkali–silica reaction (ASR) because of more than a decade of ground-water infiltration, according to an NRC inspection report released in May 2011. A growing chorus of local politicians were "urging the Nuclear Regulatory Commission to halt the relicensing process for Seabrook Station until a long-term solution is implemented".[13]
    In June 2017, Nuclear Regulatory Commission officials "reviewed numerous documents and inspected the plant as it gauges NextEra's safety plan to monitor and manage the alkali-silica reaction phenomenon present in concrete throughout the power plant".[14] In October 2017, federal regulators allowed the non-profit nuclear watchdog group C-10 to weigh in on the license amendment request.[15] The NRC has committed to finishing its review of the license amendment request concerning the alkali-silica reaction phenomenon by the third quarter of 2018.
    Community impact
    In 2013, the Nuclear Energy Institute released a study showing the positive impact of Seabrook Station on the economy and environment. Key findings are listed below.[16]
    Seabrook Station directly employs 650 people that earn more than double the average salary of workers in Rockingham County and Strafford County
    Seabrook Station generates approximately 40 percent of New Hampshire's total electricity, and its emission-free operation helps avoid the emission of nearly 4 million tons of carbon dioxide annually, which is the equivalent of taking almost 700,000 cars off the road
    Seabrook Station contributes 5 million of economic activity locally and contributes .4 billion to the U.S. economy each year, and for every dollar of output from Seabrook Station, the local economy produced .34
    Seabrook Station's financial contributions to local environmental groups over the previous decade amounted to more than million
    Public opposition
    See also: List of anti-nuclear protests in the United States
    In the eight years before construction started at Seabrook, residents had opposed the plant before regulatory agencies and in a town meeting vote. Spurred on by the failure of these methods, and the success of a large anti-nuclear site occupation in Whyl, Germany, local people formed the Clamshell Alliance.[17]
    On August 1, 1976, 600 protestors rallied at the Seabrook Station construction site. In May 1977, more than 2,000 protestors, including 1,400 members of the Clamshell Alliance, occupied the site. Of the protestors, 1,414 were arrested and held for two weeks after most refused bail.[17][18]
    Another vocal opponent of the plant was then Massachusetts Governor Michael Dukakis, who blocked the opening for several years due to environmental issues as well as concern about emergency evacuation plans. The NRC had stipulated that workable evacuation plans needed to be in place for all towns within a 10-mile (16 km) radius of the plant. Four Massachusetts towns were within the ten-mile radius, and thus Governor Dukakis' approval of evacuation plans was required.[4]
    A lawsuit complaining that the NPP would cause thermal pollution was launched by anti-nuclear opposition. This was rejected without merit, but it delayed construction by 7.5 months.[19] These protests and lawsuits are the reason the plant cost double initial estimates.[19]
    In September 2017, activist Steve Comley Sr. along with his non-profit "We The People" paid for an electronic billboard in Salisbury, Massachusetts allegedly warning of the absence of an evacuation plan in the event of an accident at Seabrook Station.[20] In January 2018, the town of Merrimac, Massachusetts joined half a dozen other communities "calling for the Nuclear Regulatory Commission to hold a hearing on whether the Seabrook, New Hampshire, nuclear power plant's evacuation plan can be effectively implemented".[21] In response, NextEra Energy released the following statement:[22]
    We have extensive emergency response systems in place, including numerous back-up safety systems that provide our plants with layer upon layer of both automated and manual protection. Also, we work collaboratively with local, state and federal officials on a regular basis to ensure our plans are comprehensive and effective and continue to refine. These most recent claims by 'We the People' and Mr. Comley are completely without merit. Mr. Comley has a long history of making false allegations and baseless claims against Seabrook. Independent agencies, including the Nuclear Regulatory Commission, have reviewed his claims and allegations and have found them to be without substance.
    Accident analysis
    Seabrook Station seen from Powwow Hill in nearby Amesbury, Massachusetts
    The Nuclear Regulatory Commission defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.[23] The 2010 U.S. population within 10 miles (16 km) of Seabrook was 118,747, an increase of 10.1 percent in a decade. The 2010 U.S. population within 50 miles (80 km) was 4,315,571, an increase of 8.7 percent since 2000. Cities within 50 miles include Boston (40 miles to city center).[24]
    The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Seabrook was 1 in 45,455, according to an NRC study published in August 2010.[25]
    _______________________________________________________________
    Why Buy From Chestnut Hill Books?
    Chestnut Hill Books has a perfect 100% feedback rating dating over 18 years and spanning 20,000+ transactions, with customers in all 50 states and over 100 countries on 6 continents. Our detailed seller ratings (item as described, communication, shipping time and shipping and handling charges) are among the best on eBay. All domestic purchases come with free shipping and complimentary delivery confirmation, trackable through
    the United States Post Office.
    Thank you for looking at our items!
    Payment:
    Payment is due within 7 days of purchase. Contact us
    for special payment requests/options. If payment cannot be produced within the 7 day period, please send a message immediately indicating when payment should be expected, otherwise an unpaid item dispute will be filed with eBay.
    Where Do We Ship?
    Chestnut Hill Books ships to every country in the world at reasonable rates as suggested by the United States Postal Service.
    Please contact us for a specific international shipping quote before bidding should you have any questions.
    Shipping Terms:
    If payment is made immediately, your item will usually be mailed within 24 hours of payment receipt.
    All items are securely packed to ensure safe shipping. Postcards are mailed between sturdy cardboard. All domestic shipments come with complimentary delivery confirmation, trackable through
    the USPS
    . Buyers will receive an e-mail from PayPal with tracking information and related links; please refer to this e-mail before contacting us with questions on the status of your package, as we will have as much delivery information as you. Zero profit is made on international shipping & handling charges; domestic shipping is free.
    Return Policy:
    We strive to describe each item completely and accurately. However, if you feel an item was not described correctly, the item can be returned at our expense within 30 days of receipt for a refund of your original payment. It is requested that you contact us immediately
    should you have any question about the condition or representation of your item.
    Who Are We?
    Chestnut Hill Books is a family-owned antiques business based out of the SouthCoast, Massachusetts. We collect historical items related to New Bedford, Massachusetts and the surrounding area (Dartmouth, Fairhaven, Westport etc), Boston College (tickets, programs, pennants, postcards, scrapbooks, pinbacks, sports & non-sports etc), Massachusetts political buttons & memorabilia and Mount Monadnock in Jaffrey, New Hampshire. Please contact us if you have any collectibles in those categories.
    Other:
    Please do not hesitate to contact us with any other questions/comments. We normally respond to all inquiries in a timely manner. Also, please do not forget to leave positive feedback upon item receipt! Thank you for looking at our listings!
    _______________________________________________________________